Installation process of rail spike

Edit:Zongxiang Heavy Industry--Lucas 2020-04-11 08:45:46

The rail spike is a less conspicuous rail accessory, but it is very practical.  Today I will introduce the installation process of rail spike, hoping everyone can have a basic understanding.

1. Installation of safety isolation facilities

This is more important, in the whole process of dynamic construction, whether it is new roads or roads that have been opened to traffic, everyone should be in safety facilities. railway dog spike for sale

2.Determine installation location

Ensure that the installation position is level. For the pavement with expansion, cracks and unevenness, the pavement shall be leveled in advance.

3.Cleaning Work

Use a brush to clean the installation position and ensure that the installation position is dry. railway dog spike for sale

4.Glue and Install

Apply a proper amount of glue to the rail spike.  Press the spike tightly on the installation position to ensure the correct direction. If there is too much glue, clean it up.

5.Hole site requirements

If it is cast aluminum spike with legs, make sure that the hole depth is 1cm greater than the leg depth and the hole diameter is 2mm greater than the leg diameter. railway dog spike for sale

6.Patrol Work

After the rail spike installation is completed, a patrol shall be conducted within two hours to ensure that all spikes are not installed reversely, crooked or crooked.

7.Ending Work

After the rail spike is solidified for 4 hours, remove the installation of isolation facilities. railway dog spike for sale

This is the whole process of rail spike installation, hoping to be helpful to everyone.

ZXsteelgroup specializes in the sales of steel rails, mining supporting materials, steel plate sales and steel plate cutting, and strictly controls the quality. After the products are put on the market, they are well received by customers. If you have any need, please feel free to ask for advice or leave us a message on the website. We believe that with your advice and help, we will do better.

Tel:+86 18236766038(WhatsApp)

Email: zxsteel@zxsteelgroup.com

Previous:What is the main difference between heavy rail and light rail? Next:What is the difference between Q235 and 55Q materials of steel rail?

Product

Contact

Tel: +86-199 3712 3680 WhatsApp: +86-199 3712 3680 E-mail: zxsteel@zxsteelgroup.com

Address:Zhengshang International Plaza A, Hanghai East Road,

Guancheng District, Zhengzhou City, Henan Province, China.

JOIN OUR MAILING LIST
We promise to send only good things