YOUR POSITION: HOME > Information
Edit:Zongxiang Heavy Industry--Lucas Date:2020-05-06 14:42:46
During the track-laying process of high-speed railway, the longest single rail is 500 meters long, which is also the longest rail in the current railway track-laying. No joint can be seen on this 350-kilometer-per-hour line, just like two complete steel rails going through to the end. railway track material
There is no more disturbing "thud" sound when the train is running on smooth lines, even coins can be stably erected in the high-speed railway carriages "flying on the ground". These rails will encounter unprecedented challenges in welding, lifting and transportation. Let's take a look at the "birth" process of these super-long rails. railway track material
At the rail welding base, their main task every day is to weld 100 meters of rail from the steel mill into 500 meters of high-speed rail.
Welding production is divided into appearance
inspection, derusting before welding, rail welding, welding rib shaping, fine
straightening, quality inspection and flaw detection, etc. Staff strictly follow the standard and
control the quality of each production link. railway track material
Enter the workspace
Careful preparation
Pre-weld inspection
Weld alignment
Precision welding
Carefully check
First grinding
Normalization of rail
Second grinding
Careful examination
ZXsteelgroup specializes in the sales of steel rails, mining supporting materials, steel plate sales and steel plate cutting, and strictly controls the quality. After the products are put on the market, they are well received by customers. If you have any need, please feel free to ask for advice or leave us a message on the website. We believe that with your advice and help, we will do better.
Tel:+86 18236766038(WhatsApp)
Email: zxsteel@zxsteelgroup.com
Online Chat
To top