Steel rail also can called railway track,steel railway track ,etc. Steel rail is a metal groove or ridge that holds, guides, and reduces friction for a moving device or apparatus. It's paved with strip steel route for driving the train, trolley, etc.
The standard steel rail usually composed by two joint bars,rails fixed to the sleepers, rail pad under the sleepers for the road, including roadbed, rail connection parts, etc.
Our company Henan Zongxiang Heavy Industry Import & Export Co., Ltd supply JISE 1103/1101 standard steel rails with high quality and competitive prices. Our JIS standard rails are of improved stability and reduced maintenance, which can meet your most stringent requirements. These products are widely used in the construction, manufacturing, mining, and other industries. We are JIS standard rail manufacturer, has provided superior rail products to global customers for many years.
JISE1103/1101 STANDARD | |||||||
SIZE | DIMENSION(mm) | ||||||
HEAD |
Head Width |
Height | Base Width | Web |
Theoretical Weight (kg/m) |
Material | Length(m) |
JIS 15KG | 42.86 | 79.37 | 79.37 | 8.33 | 15.2 | 55Q | 10--12 |
JIS 22KG | 50.8 | 93.66 | 93.66 | 10.72 | 22.3 | 55Q | 10--12 |
JIS 30 A | 60.33 | 107.95 | 107.95 | 12.3 | 30.1 | 55Q | 10--12 |
JIS 37 A | 62.71 | 122.24 | 122.24 | 13.49 | 37.2 | U71Mn | 10--12 |
JIS 50 N | 65 | 153 | 127 | 15 | 50.4 | U71Mn | 10--12 |
CR 73 | 100 | 135 | 140 | 32 | 73.3 | U71Mn | 10--12 |
CR 100 | 120 | 150 | 155 | 39 | 100.2 | U71Mn | 10--12 |
Product Show
Packaging & Shipping
Packing Details : in bundle packed by steel wire
Delivery Details : shipped within 20-35 working days after payment
Company Information
Henan Zongxiang Heavy Industry Import & Export Co., Ltd specialize in this field in 1997, with good quality and pretty competitive price. Our company has all sorts of steel products. steel rail with all standards, steel rail accessories, H-beam, U-beam, steel plate, steel stripe, mine arch support, we give you a wide range of choices.
FAQ
1. What's your MOQ(minimum order quantity)?
Usually one 20" or 40" container. But as for the first order, can be negotiated.
2. What's your packing?
For steel rail, in bundle by steel wire, or as customer's requirement.
3. What's your payment terms?
a. 30% deposit by T/T, balance against B/L copy
b. 100% irrevocable LC at sight
c. be negotiable as per order quantity
4. What's your delivery time?
Usually 20-35 working days after receiving deposit or the original LC.
If the products out of stock, delivery time should depend on the production schedule.
5. Are you manufacturer or trader?
We are the manufacturer.
6. Can we visit your factory?
Warmly welcome. Once we have your schedule, we can arrange everything in advance.
Online Chat
To top